.". Workplace Safety And Health ,WSH Safety Resources Blog: Accelerated Depreciation Allowance for Noise Control

Featured Post

Smaller-scale Construction Works Safety

 Smaller-scale Construction Works Safety In 2023, 11 fatalities and 100 major injuries resulting from smaller-scale construction works (e.g....

Showing posts with label Accelerated Depreciation Allowance for Noise Control. Show all posts
Showing posts with label Accelerated Depreciation Allowance for Noise Control. Show all posts

Tuesday, February 5, 2013

Accelerated Depreciation Allowance for Noise Control - How to Qualify

How to Qualify

In order to qualify for the accelerated depreciation allowance, the implemented noise control measures (e.g. machines, equipment, systems or devices) must:
  • Be new (used or reconditioned items are not eligible);
  • Belong to the applicant (rented items are not eligible);
  • Not carry other health risks e.g. excessive chemical exposure; and
  • Not have received financial grants from other Government agencies.
The measures should also reduce the noise levels at the actual work location on a normal workday to 82 dB(A) or less. The reading should take into account not just the noise generated by the implemented measures but also any noise caused by other sources in the vicinity, as well as at the workplace location itself, both indoors and outdoors.
A Certifying Agency must be engaged to take the readings.
The noise level readings will be taken as follows:
  • For machines, equipment or systems with in-built noise control features:

    The reading should be taken either from 1m away or at the operator's location, whichever is nearer; or
  • For machines, equipment, systems or processes with noise control devices or measures installed/implemented:

    Readings should be taken both before and after installation/implementation, while all other acoustic conditions remain the same. The reading should be above 85 dB(A) before installation/implementation.

    The readings should be taken either from 1m away or at the operator's location, whichever is nearer. An exception to this is when enclosures/sound barriers have been installed, in which case, the readings should be made at the boundary of the enclosure/barrier. Workers who enter the enclosure/barrier must also be adequately protected from the noise.
To ensure the effectiveness of the noise control measures implemented, a competent noise control agency or consultant should be engaged.

SCDF upcoming events

(adsbygoogle = window.adsbygoogle || []).push({});

Upcoming Events

HardwareZone Singapore

Jobs Portal