  WSH Advisory for Fatal Accidents in Second Half of 2023 The Ministry of Manpower has released the WSH statistics for 2023. Singapore’s wor...

Monday, March 27, 2023

Thermal Fogging Fire Prevention

 Prevention of Fire during Thermal Fogging 

Flash Fires in Refuse Chutes

Thermal fogging is inherently dangerous especially when it is carried out in confined spaces. Three flash fires occurred in the past when thermal fogging was carried out in condominium refuse chutes. The fogging operators involved in the accidents suffered various degree of burns on their arms, face and neck, and in one case, the operator was given two months of medical leave. This circular serves to provide advice and guidance to fogging operators on measures to prevent the occurrence of similar accidents. 

Cause of Fire Thermal fogging machines generate mist (fine liquid droplets) and vapour from the chemical solution containing a mixture of pesticide and diesel which is used as a carrier. Diesel is a flammable liquid with a flash point* between 52 and 96°C, and an auto-ignition temperature** of about 257°C. The machine operates at about 100°C (gas stream temperature at the outlet) which is above the flash point of diesel. The flash fires were likely due to the diesel vapour accumulated in the confined refuse chutes and ignited by the hot fogger nozzle (surface temperature > 400°C) which is above the auto-ignition temperature of diesel. 

Preventive Measures 

To prevent a recurrence of the flash fire and to safeguard the health anal safety of fogging operators, follow the machine manufacturer's instructions and observe the following measures. 

  1. Do not use diesel or any flammable solvent as a carrier for fogging in refuse chutes and other confined spaces; use a non-flammable solvent or water-based fogging instead. 
  2. Always wear appropriate personal protective equipment e.g. respirator, safety goggles, gloves, safety boots, earplugs and coverall. 
  3. Fill solution (chemical or petroleum) to not more than 3/4 tank capacity to prevent over-filling or spillage; check that the caps of the solution and petroleum tanks are secured. 
  4. Turn off the fogging machine and allow it to cool before refuelling to prevent accidental ignition of any spilled petroleum fuel. 
  5. Do not allow new workers to operate the machine without close supervision and training. 
  6. Allow only trained workers to handle pesticides and chemicals. They must be warned of the hazards involved and the precautionary measures to be taken. Refer to the safety data sheets of these substances for details. 
  7. Label all chemical containers in accordance with Singapore Standard SS586 Part 2 — Globally Harmonized System (GHS) on Classification and Labelling of Chemicals. Please visit https://www.tal.sg/wshc/topics/chemicals/globally-harmonised-system-of-classification-and-labelling-of-chemicals for more information on GHS. 

Duties of Employers 

Every employer must: •

  • conduct a risk assessment in relation to the safety and health risks posed to any person who may be affected by his undertaking, and take all reasonably practicable steps to eliminate any foreseeable risk - this is required under the Workplace Safety and Health (Risk Management) Regulations.
  • take reasonably practicable measures to ensure the safety and health of his employees at work, as well as other persons (not being his employees) who may be affected by any undertaking carried on by him in the workplace - this is required under the Workplace Safety and Health Act
  • report accidents, dangerous occurrences and occupational diseases that occur in the workplace - this is mandatory under the WSH (Incident Reporting) Regulations


Thursday, March 23, 2023

Workforce Singapore’s Career Conversion Programme

What is Workforce Singapore’s Career Conversion Programme ?

If you haven’t heard of Workforce Singapore’s Career Conversion Programme (CCP), here’s a crash course on what they are and how they’ll help you in your career journey.

Let’s face it- with jobs being redesigned so frequently these days, thanks to digitalisation, learning is no longer just the time we spend in school during our youth, but a lifelong journey.

Changes in business environment, improvements and technology, and shifts in employee demographics mean that jobseekers and employees alike have to stay agile in order to remain competitive in the job market.

For example, consumers in Singapore are increasingly using smartphones for e-payments and banking transactions, which reduced the need for physical bank branches or tellers.

With technology, the nature of job roles in the financial services sector changed, and many tellers were reskilled and redeployed as digital ambassadors, video tellers, customer service officers, and even chatbot trainers.

The pandemic sped up digital transformation across all companies and sectors and pushed them to pivot to a new direction to remain relevant and competitive.

Today, as businesses restart and prepare for a rebound in a Covid-19 endemic world, the need to have the right talent pool and workforce capability is a crucial step forward.

Plug-and-play vs Plug-train-play

With this, the nature of jobs correspondingly changed and shifted towards broader value creation.

Redesigning jobs was part of the process to free up capacity for redesigned work. Automation and digital technologies could alleviate rote work and allow the workforce to spend more time on value-added tasks such as engaging customers, developing complex design concepts and interpreting data, which ultimately contribute to business revenue.

Owing to the redesigned jobs, new talents are required to fill the gap. Employers should rethink their hiring considerations and move away from a “plug-and-play” approach to one that is “plug-train-play”.

In this tight labour market, employers stand to gain with a wider pool of candidates when they consider those from other sectors or occupations, and untapped pockets of the workforce like back-to-work women and mid-career individuals who have relevant transferable skillsets and experience.

At Workforce Singapore (WSG), we continue to encourage businesses to keep the longer-term view in mind and to look for opportunities to transform their business models and workforce.

We partner and journey alongside employers in guiding them through this transformation process with relevant programmes to support their manpower needs and challenges.

We have seen how companies that value their employees and support them in their reskilling journey have emerged stronger from the pandemic

What is a Career Conversion Programme?

A key initiative that companies can tap is the Career Conversion Programme (CCP), which allows mid-career individuals and existing employees to undergo skills conversion and move into new occupations or sectors that have good prospects and opportunities for progression.

Currently, there are close to 100 CCPs across nearly 30 sectors. There is healthy interest from companies who have considered taking in mid-career jobseekers to augment their current workforce, and also those who have retained and reskilled existing employees so that they can take on new or redesigned job roles to support new business functions arising from the pandemic.

In 2020, WSG ramped up the CCPs to help businesses in sectors that were badly impacted by the pandemic – such as the air transport and hotel sectors – leverage redeployment to reskill workers and avert retrenchments.

Together with the companies, sector agencies and unions, we mapped out their manpower planning, identified job roles that could be redesigned and employees that could be reskilled to take on new or expanded job roles for the future.

One progressive employer is Raffles Hotel Singapore, which worked alongside WSG to streamline some job roles and improve productivity.

For example, workers in their laundry and uniform room teams, which were previously managed independently, were cross-trained in their respective operations and the job was redesigned into a single role.

This allowed the team to cover duties when required, resulting in increased efficiency in attending to guests’ requests. Now that the tourists have returned to our shores, the workers are better prepared to take on larger roles as required, alleviating the company’s manpower challenges.

dNata Singapore is another company that took good care of their employees. During the downturn, the company placed about 100 employees on a 6-month CCP for air transport coordinators, which allowed their employees to be upskilled to take on new or expanded job roles.

The knowledge and skills gained allowed them to provide passenger service for multiple airlines, and handle multiple aircraft types including narrow-body, wide-body and freighter aircraft during turnaround services. This enabled employees to be deployed easily to various teams when the need arose.

Recently, WSG also launched a new CCP for multi-skilled essential employees (real estate/facilities management) to help these companies transform their businesses through job-redesign.

An example of a multi-skilled job role is a facilities technician who can perform building checks and surveillance duties. The job scope includes technical service to resolve facility-related issues, as well as building area monitoring and incidence reporting through in-house digital systems.

How are businesses changing their employment strategies?

To make job redesign more accessible, and to spur the implementation of job redesign initiatives, companies can tap on the Support for Job Redesign under the Productivity Solutions Grant where they can work with established job redesign consultants, with WSG providing up to 70 per cent funding support for consultancy services, capped at S$30,000.

Through expert guidance, companies can confidently embark on job redesign and transform their business to make jobs more productive and attractive for workers.

The pandemic has set up what could be lasting employment-landscape shifts that would require the reskilling of the workforce.

As companies decide on strategies that will shore up the future of the business, it is critical for HR professionals to go deeper into strategic workforce planning with business units and map out new or enhanced job roles that are needed to drive the company forward.

To achieve a successful job redesign outcome, it is paramount for top management and HR professionals to play an active role so that employees will be “all in” and look forward to contributing positively to the firm’s success.

Ultimately, employers also need to be clear about the intended objectives – be it to improve productivity, improve staff retention or increase job satisfaction for example – as these objectives will drive how the redesign is approached and what solutions will be developed.

At the end of the day, job redesign should not be seen as just a paper exercise, after all.

Exploring a career switch? Want to sign up for a WSG programme but unsure which one best fits your needs? Register for a complimentary session with a WSG Career Guidance professional to guide you through your career journey.




Tuesday, March 21, 2023

Indoor Air Quality Guidelines

INTRODUCTION

The indoor air quality of air-conditioned offices is a subject of public health importance because we spend a substantial amount of time in these premises. Good indoor air quality can lead to improved productivity at the workplace. On the other hand, poor indoor air quality will cause productivity to drop because of comfort problems, ill health and sicknessabsenteeism.

Our city's tropical climate, highly built environment, and energy conservation requirements pose special constraints and challenges to the building industry in ensuring that indoor air quality remains acceptable. In 1995, my Ministry appointed a Technical Advisory Committee on Indoor Air Quality comprising members from both private and public sectors to advise on the guidelines for good air quality. This document represents a very important first step towards interdisciplinary consensus on the issue of indoor air quality.

The objective of this document is to provide general guidance on improving the indoor air quality of air-conditioned office premises and acceptable values for selected parameters. It also provides information on the potential health effects of indoor contaminants, and an action plan to achieve good indoor air quality. The contents are intended to complement the engineering specifications set out in the Singapore Standard Code of Practicefor Mechanical Ventilation and Air-conditioning in Buildings (SS CP13), and should be useful to building owners/management corporations, those involved in servicing the ventilation and air-conditioning systems, and all others responsible for designing, operating and maintaining the building environment. As research continues, amendments may be made from time to time in subsequent editions.

Purpose

The purpose of this document is to provide guidelines for good indoor air quality. 

Scope and application

This document applies to all buildings, new and existing, which are air-conditioned and used as office premises in Singapore.

The indoor air quality parameters addressed are carbon dioxide, carbon monoxide, formaldehyde, ozone, volatile organic chemicals, total bacterial counts, total fungal counts, suspended particulate matter, air temperature, relative humidity, and air movement.

Guideline maximum concentrations for acceptable indoor air quality are specified for carbon dioxide, carbon monoxide, formaldehyde, and ozone based on their known health effects.

Recommended maximum concentrations for acceptable indoor air quality are specified for suspended particulate matter, volatile organic chemicals, bacteria and fungi based on their potential health effects.

Because human health and comfort are complex issues responsive to the interaction of multiple factors, guideline acceptable values are specified for indoor air temperature, relative humidity, and air movement.

IDENTIFYING INDOOR AIR QUALITY PROBLEMS

1  Assessment of indoor air quality problems

14.1 It should be the responsibility of the owner of the building to:

(a) assess the risks to health arising from the indoor air quality;

(b) set up a programme to ensure acceptable indoor air quality, implement the programme, and monitor the effectiveness of the programme; and

(c) keep records of all activities implemented.

1.2 The owner should ensure that the building inclusive of its installations is designed, constructed, operated and maintained in such a way that acceptable indoor air quality is achieved.

1.3 Those engaged by the building owner to carry out the assessment of any indoor air quality problems should be competent persons who are adequately qualified and experienced, and provide supervision for the management of the indoor air quality programme.

2 Indoor air quality and health

2.1 Good indoor air quality improves productivity at the workplace. On the other hand, poor indoor air quality could lead to losses in productivity as a result of comfort problems, ill health and sickness-absenteeism.

2.2 Building-related illness is said to occur when occupant exposure to indoor contaminants results in a clinically defined illness, disease or infirmity. Some common indoor air contaminants and their sources are listed in Appendix A. Those affected usually require prolonged recovery after leaving the building.

2.3 Sick building syndrome is said to occur when a substantial proportion of the occupants of a building experience symptoms associated with acute discomfort that are relieved upon leaving the premises. The mechanisms are still not fully understood, but indoor air quality is thought to be contributory. Those affected typically recover completely soon after leaving the building.

2.4 Factors affecting indoor air which can give rise to poor air quality are: the presence of indoor pollution sources; poorly designed, maintained or operated ACMV systems; and uses of the building that were unplanned for when the building was designed or renovated.

3 Action plan to achieve good indoor air quality

3.1 In the event or on the suspicion that the indoor air quality is not good, the following should be made available for inspection during an investigation:

 (a) building plans showing the details of all the floors, and location of the cooling towers and fresh air inlets to the building;

(b) ACMV system layout plans or schematics; and

(c) ACMV system operating schedule and maintenance records.

3.2 A walk-through inspection of the premises and the ACMV system should be conducted by the competent persons to identify possible irregularities. A sample checklist for building inspection is provided in Appendix B.

3.3 Feedback from occupants on the conditions in the building and the operation of the ACMV system should be obtained by the competent persons. A sample confidential questionnaire which can be administered to obtain information is provided in Appendix C.

3.4 Indoor air analysis, and any environmental or biological sampling, should be conducted by the competent persons if deemed necessary for the investigation so that adjustments or alterations can be made.

3.5 Based on the findings of (6.1)-(6.4), building remedial measures should be formulated, implemented and evaluated so that good indoor air quality can be achieved and does not deteriorate again in future.

IMPROVING INDOOR AIR QUALITY

4 Design

4.1 A new or retrofitted building should be designed with regard to the pollution which may arise within the building. Unless a space has adequate openable windows that can meet natural ventilation requirements, the building should be provided with a mechanical ventilation system that can be operated when required to purge the indoor air from the space, in addition to the air-conditioning system.

4.2 The ACMV system should be designed so that the potential spread of contaminants in the building is kept low. Materials used should not include those that emit chemicals, bacteria or fungi to the supply air. Pollution sources, or pollutive activities of frequent occurrence, should be provided with such process ventilation of the encapsulation, hood or local extraction type so that the spread of contaminants is prevented.

4.3 Building materials and surface finishes should not contain any substances that emit chemicals, bacteria or fungi. They should be able to stand up to the intended use and not cause any emission of contaminants to the indoor air.

4.4 Water supply, drainage, sewerage and other installations should be planned for construction in such a way that the risk of leaks and consequential damage caused by leaks is prevented.

4.5 Outdoor air intakes should be placed where the air admitted is likely to be cleanest, taking into consideration the outdoor air quality standards specified in Appendix D, the position of the building, the exhaust opening position, traffic routes, carparks, unloading bays, refuse chutes and other nearby sources of pollution. Intakes should not be located below ground level or close to evaporative cooling towers. Outdoor air filters should be placed as close as possible to the intake points.

4.6 The building should be designed so that cleaning of windows, doors, floors and other surfaces in contact with supply air or room air is possible. Such surfaces should be cleaned before the building is taken into use. Surfaces which are likely to become heavily soiled should be readily accessible and easily cleanable.

Construction

5.1 At all stages of the construction of the building and its ACMV system, inspections should be made by the competent persons so that acceptable indoor air quality can be secured when the system is put into operation.

5.2 The building structure should be constructed in such a way that harmful spread of contaminants from the outside, the ground, or some other separate part of the building does not occur.

5.3 In the construction of the ACMV system, the supply and return air ducts should be made accessible for inspection and cleaning. Components should be made of materials which stand up to the intended use and maintenance. Those which require attendance and maintenance should be sited so that they are readily accessible and replaceable, and mounted so that work can be carried out easily and safely. To reduce dust accumulation, the inner surfaces of the ducts for supply and return air should be smooth and resistant to abrasion.

5.4 Outdoor air for ventilation and indoor air that is to be recirculated should be filtered for particulates. A filter should be placed for outdoor air that is to be introduced into an air handling unit room. The filter should be protected from being wetted by sprays, rain, etc. In placing the filters, there should be an adequate seal between the air filters and the walls of the surroundings ducts or units.

5.5 Installations unrelated to the ACMV system should not be located in the air-handling unit rooms

6 Commissioning and operation

6.1 Before a new or retrofitted building is commissioned into service, it should be demonstrated that the ACMV system has been constructed and is able to function in the way intended. The entire ACMV system should be cleared of any construction debris and dirt, and cleaned before operation starts.

6.2 The specifications and operations of the ACMV system should be in accordance with all provisions of the Singapore Standard Code of Practice for Mechanical Ventilation and Air-conditioning in Buildings (SS CP13).

6.3 Unless there are strong pollutants sources, in which case corrective action should be taken, the ventilation rate should be sufficient to dilute or remove any airborne contaminants to levels which comply with the indoor air quality guideline values specified in Appendix E. Where this is not possible, an air-purging system should be activated to enable purging of the contaminated air, routinely or as and when required.

6.4 It should be possible to assess at any time the condition of the filter, including the pressure drop, the contamination and the installation. The minimum arrestance efficiency for the air filters for cleaning outdoor and indoor air should be 60% and 80%, respectively.

6.5 Instructions for the operation of the building and its ACMV system should be drawn up in direct cooperation with the operations and maintenance staff, including all necessary information for satisfactory ventilation of the rooms served. The instructions manual for each ACMV system should include: (a) a schematic plan of the system; (b) its operation; and (c) the precautions to be taken specifying checks and their frequency, and steps to be taken to remedy defects and deficiencies.

6.6 Rooms where air handling units are situated should not be used as passage ways or for storage. Where they open to a source of contamination, the doors of the rooms should remain air-tight. The inner surfaces of the units and equipment should be easy to clean and abrasion-resistant. Sufficient space for cleaning and for access to the units should be provided.

6.7 Air distribution should be efficient, effective and uniform to ensure no stagnation of air in dead spaces.

7 Renovation

7.1 Major renovation works should be undertaken in such a way that a satisfactory indoor environment is secured. Where relevant to the renovation works, consideration should be given to (7.1)-(7.6) and (8.1)-(8.5) in the stages of design and construction, respectively.

7.2 Processes and activities should be selected so that they have the lowest possible emission. Where processes and activities which pollute the air cannot be avoided, they should as far as possible be encapsulated, provided with local extraction, carried out in areas with direct exhaust to the exterior, or limited to times when few people are exposed.

7.3 The building materials should not contain any toxic substances which could pose a hazard to health when used in the occupied building. Fittings, fixtures, furnishings and furniture should be manufactured, selected, handled, stored and used so that emission to the room air is the least possible.

7.4 For occupied buildings undergoing partial renovation, spaces to be renovated should be effectively isolated from the occupied zones. If necessary, supply air should be separated so that acceptable indoor air quality for the occupants is maintained. Concentrations of formaldehyde, volatile organic compounds, suspended particulate matter and other contaminants in room air should be within the limits specified in Appendix E.

7.5 After any major renovation to the building where the airconditioning  system has been affected (eg. by partitioning of office space), rebalancing of the air distribution should be required

8 Maintenance

8.1 Competent persons should be employed specifically to ensure that regular maintenance of the building inclusive of the ACMV system is carried out on a routine basis. Maintenance staff should be familiar with the prevention of any hazard arising from the building.

8.2 The schedule of maintenance for the ACMV system should be in accordance with the manufacturer's recommendation to ensure that the equipment operate efficiently. If this is not specified for any component, the frequencies listed in (11.3)- (11.7) should constitute the minimum requirements.

8.3 The building and its ACMV system should be inspected at least every six months with regard to functions which are significant for the indoor air quality. Normal operation of the system should be monitored so that it continues to operate at maximum efficiency and breakdowns are avoided.

8.4 The ACMV system and the air handling unit room should be cleaned and maintained in such a way that the indoor air quality is not adversely affected by the cleaning and maintenance. The components of air-handling units such as fans and dampers should be cleaned at least every six months, depending on the condition of the incoming air and use of the system. Filters should be cleaned or replaced so that they are performing properly at all times and do not become clogged.

8.5 Cooling coils, condensate pipes and water trays should be checked regularly for signs of sludge, algae or rust build-up, chokage and leaks where water could enter the airstream. Coils and condensate pipes should be cleaned at least every six months. The trays should be cleaned at least every one month to ensure that contaminants do not build up. Any ferrous metal surface should be treated with an anticorrosion coating. Re-circulating water should also be treated to prevent rust but that treated water must not be allowed to enter the airstream.

8.6 Cooling towers should be cleaned and treated in accordance with guidelines specified in the Code of Practice for the control oflegionella bacteria in air-conditioning cooling towers in Singapore (Ministryof the Environment, August 1992).

8.7 The ACMV system should be checked and adjusted to ensure correct air flow, temperature and humidity after the first year of operation and at least every two years thereafter. It should also be checked and adjusted after any renovations or changes in floor layout that might affect air distribution.

8.8 Records should be kept of all maintenance work - when and what was done.

9 Quality control

9.1 An audit should be conducted by the competent persons within six months after commencement of operation of the ACMV system. The information for such an audit is similar to that which is collected in (6.1)-(6.4) when investigating an occurrence of building-associated illness, but includes the entire building rather than focusing on any area with an identified problem.

9.2 During the normal operation of a building, an audit should be conducted by the competent persons at least every two years to ensure that the indoor air quality is acceptable and conforms to the specifications listed in Appendix E.

9.3 When indoor air testing is required to study if the air quality complies with the relevant specifications, the tests should be carried out by a laboratory accredited under the Singapore Laboratory Accreditation Scheme.

9.4 The necessary plans, drawings and specifications on the building and its installations should be kept by the owner or the management corporation of the building, and made available for inspection when necessary.

9.5 A formal record book containing adequate and accurate information on the ACMV system should be kept by the owner or the management corporation of the building, and made available for inspection when necessary. The information should include:

(a) description of the air-conditioning system;

(b) name of the building manager or person who ensures that proper records are kept;

(c) person or company who is responsible for the assessment of risk, and implementing and managing precautionary measures;

(d) person or company carrying out the maintenance programme; and

(e) details of maintenance, including:

(i) date and result of visual inspection;

(ii) date and type of cleaning/treatment works conducted; and

(iii) date and nature of any remedial works (if required).

 

Monday, March 20, 2023

SCDF New Fire Fighting System

Singapore: SCDF had finally added into its fleet of fire fighting equipment inventory -modular oil tank firefighting systems to fight large scale fire.

Modular oil tank firefighting system is SCDF’s latest tool in fighting large-scale fires.

The components of SCDF's latest-generation oil tank firefighting system – such as water pumps and large monitors – can be put together in different ways to combat large-scale oil storage tank fires.



The new system also can discharge up to 100,000 litres of foam solution per minute, equivalent to filling up an Olympic-sized swimming pool within 25 minutes – a significant increase from up to 60,500 litres per minute

MONITORS WITH HIGHER CAPACITIES

In the past, SCDF had two monitors – which dispense water or foam at high capacities – to mitigate large-scale oil tank fires. These were deployed to fires at 23 Tembusu Road on Jurong Island in 2016 and Pulau Busing in 2018.

Now, the modular oil tank firefighting system features monitors that can pump out more foam, allowing SCDF to better fight fires involving larger oil tanks.

One monitor can be connected to a booster pump unit, which serves as the nerve centre of the system where important parameters such as water flow and pressure are controlled.

The booster pump unit can then be connected to a submersible pump unit or a collecting manifold.

The former collects water from an open water source like the sea and supplies it to a pump placed up to 60m away, while the latter allows SCDF’s 12-inch hoses to connect to 5-inch industrial ring mains, which are what Singapore stipulates for companies to provide on their premises

In addition, SCDF can cut down on the number of monitors it deploys because the new monitors are larger-volume ones – up to 80,000 litres per minute, as compared to 22,700 litres per minute, for an individual monitor.

"This allows the SCDF to rapidly intervene and mitigate oil tank fires of up to 112m in diameter," said Colonel Mohamed Firoz Ramjan, commander of the 1st SCDF Division.

Through the use of 12-inch hoses with the new system, SCDF officers can also lay hoses on the ground in a neater and more systematic fashion.

This delivers the same water rate as before, when a smaller number of hose lines were required to run the older system.

The modular oil tank firefighting system's pod-on-vehicle concept also means that its various components can be easily transported on pod carriers to other offshore islands via the use of barges.

TACKLING HAZARDOUS MATERIALS

SCDF also showcased different personal protective equipment (PPE) that responders wear during HazMat incidents, along with vehicles and its robotic dog that can be deployed in chemical plants.

The PPE to be worn depends on the hazardous substance involved and the environment the responders will be operating in.

For example, the light decon suit is a disposable lightweight suit to protect SCDF officers in decontamination operations.

It provides 24 hours of protection in liquid and vapour-hazard areas, and responders get constant airflow through a gas mask with canisters attached to a powered air-purifying respirator on a belt.

Another high-performance suit with self-contained breathing apparatus has an airtight design and is resistant to acids, alcohols and bases, among other hazardous materials.

It can resist temperatures of at least -40 to 60 degrees Celsus for normal use, and up to 100 degrees Celsius for shorter periods.

Among the vehicles that SCDF will roll out during Exercise Northstar is the HazMat Control Vehicle, which helps to identify hazardous substances, assess the extent of contamination and determine the mitigation approach.

Colonel Shaiful Herman Shali, director of SCDF's HazMat department, told reporters: “(It has) the latest in terms of equipment and technology to detect and identify hazardous substances.

“Within this vehicle, we also have standoff detection capabilities, which allow us to visualise and detect chemicals that may be up to 5km away. This is very important in terms of early warning capabilities.”

The HazMat Control Vehicle, which is currently in its third generation, also has an unmanned aerial vehicle launch pad and analytical equipment for the identification of hazardous substances.

The HazMat Incident Management System that is within the HazMat Control Vehicle enables SCDF officers to conduct wide-scale monitoring during a hazmat incident.

Wall-to-wall monitors in the vehicle can track the air quality in an area, for instance. The system can also aggregate sensor data from various agencies.

It was jointly developed by SCDF, the Home Team Science and Technology Agency, the Defence Science and Technology Agency and DSO National Laboratories.

The Ventilation Vehicle, which was introduced in 2004, can disperse chemical plumes during a HazMat incident and help to combat fires in areas like highway tunnels and industrial areas where ventilation may be limited.

Hoses can also be connected to the vehicles to provide water mists.

SCDF has two such ventilation vehicles at Ang Mo Kio Fire Station and Marina Bay Fire Station, where highway tunnels are close by.

Col Shaiful said: "We will also have, on-site, our HazMat specialists who are trained and well-equipped to mitigate all types of HazMat leaks and scenarios. With all these capabilities and competencies, we will be able to keep Singapore safe."

To learn more click here

Sunday, March 19, 2023

Construction Safety Webinar -WAH


Construction Safety Webinar “Work-at-height” (Technology and Innovation)

Enhancing Safety and Mitigating Risks in Construction Work-at-Height through Technology and Innovation 

Webinar Overview

Working at height is a common activity in the construction industry, but it also comes with inherent risks. Falls from height are one of the leading causes of workplace injuries and fatalities. At SCAL Academy, we understand the importance of safety in the construction industry, and that's why we're organizing a seminar on "Construction Safety Seminar: Work-at-Height" (Technology and Innovation).

This seminar will focus on the use of innovation and technology to improve safety at work at height. We will cover various topics related to work at height safety, including common risks, heat risk mitigation to prevent accidents, current technology used to improve safety at working from heights and current work at height safety regulations. 

Who Should Attend?

This webinar is designed for anyone involved in the construction or high-risk industries.

  • WSH Professionals

  • RM Professionals

  • Site Supervisors

  • Project Managers

  • Contractors

  • Engineers and Architects

  • CEOs and Top Management

Whether you are looking to enhance your knowledge and skills in work at height safety or stay up to date with the latest trends and technologies, this webinar is the perfect platform for you. 

Why Attend?

The Construction Safety Webinar "Work-at-height" (Technology and Innovation) is a must-attend event for anyone involved in construction or maintenance work, particularly those who are involved in work at height. This webinar offers a unique opportunity to learn from industry experts and gain valuable insights into the latest trends, technologies, and best practices in work at height safety. 

What Will You Learn?

During the seminar, attendees will learn about various topics related to mitigating work at height risks, including accident case studies, common contraventions, risk management, ladder safety, safe work practices, and technology applications. Attendees will also gain insights into innovative solutions for mitigating heat stress in the construction industry, particularly for workers operating at heights.

Webinar Topics

Accident case studies and Common Contraventions in relation to Working at Heights

by Mr Leo Deng Lip, Team Lead, Ops (Con), OSH Inspectorate Department Ops (Construction) & Surveillance, Ministry of Manpower

This presentation will provide attendees with valuable insights into the common hazards and risks associated with working at heights that are still commonly observed at construction worksites. Mr. Deng will share accident case studies to illustrate the real-life consequences of failing to implement safety measures when working at height. He will also highlight the common contraventions related to working at heights that are often observed on construction sites. 

Manage Risk at Worksite

Gold Winner of the SCAL Workplace Safety & Health for SLOTS Award 2022 by Mr Rafiqul Islam, Corporate EHS Manager, Chian Teck Realty Pte Ltd

In this presentation, Mr. Rafiqul Islam, Corporate EHS Manager at Chian Teck Realty Pte Ltd, will share valuable insights on managing risks at worksites, with a particular focus on high-risk activities such as working at height, lifting operations, and the use of MEWPs. Attendees will learn about Chian Teck Realty's best practices in promoting WSH awareness and leveraging technology and resources to maintain a safe, healthy, and conducive work environment. These practices have earned the company the Gold Award for the SCAL Workplace Safety & Health Award for SLOTS Registered Contractors in 2022. 

Salient point of SSEN131 (Advises on the safe use of ladders)

by Mr Rong Jing Xiang, Member, SCAL WSH Subcommittee and WAH Task force

In this presentation, Mr. Rong Jing Xiang, Member of the SCAL WSH Subcommittee and WAH Task force, will discuss the salient points of SSEN131, which provides guidance on the safe use of ladders. Attendees will learn about the key considerations when selecting and using ladders, as well as the common hazards and risks associated with ladder use. The presentation will also cover the legal requirements for ladder safety and best practices for ensuring ladder safety on construction sites. 

Sharing of Work Practices for Work at Heights

by Mr Crawford Ang, Director, WSHE, Woh Hup (Private) Limited

In this presentation, Mr. Crawford Ang, Director of WSHE at Woh Hup (Private) Limited, will share some considerations and work practices for safe work at heights. Work at heights is a high-risk activity that often results in serious injuries, but implementing safe measures doesn't have to be difficult. Attendees can expect to learn practical tips and safe principles that can be adopted to help make working at heights safer. 

Technology to enhance safety (Artificial Intelligence for WAH Safety)

by Invigilo and Mr Goh Chye Guan

This presentation will focus on how artificial intelligence can be used to enhance safety measures in the context of working at heights. Attendees will gain insights into how AI can be applied to safety monitoring and risk assessment, as well as the benefits and limitations of using AI in safety management. The presentation will highlight real-world examples of AI applications in work at height safety, providing attendees with practical knowledge on how to leverage technology to improve safety outcomes in their own workplaces. 

Workers’ health, safety and productivity in a warming world

by Prof Jason, NUS

As global temperatures continue to rise, climate change will create serious health risks and undermine labour productivity in many vocations, creating new challenges in this area. In this presentation Prof Jason will share about Project HeatSafe. Project HeatSafe is a collaborative research project based in the National University of Singapore. This project combines the expertise of researchers from a range of different disciplines to investigate the impacts of rising heat levels on the health and productivity of people in Southeast Asia. 

Trial results for heat stress mitigation in Construction using ice slurry

by Mr Alvin Tan, Senior Manager (WSH Technology), WSH Institute (WSHI)

In this presentation attendees will learn about the results of a recent field trial conducted at a construction site in Singapore to measure the effectiveness of ingesting ice slurry for heat stress mitigation. The ingestion of ice slurry has been shown to mitigate heat injuries and improve heat tolerance by lowering body core temperature, and it is recommended under the WSH Guidelines as a measure to induce greater internal cooling for workers on hot days. This presentation will also assess the receptiveness of workers to drinking ice slurry. Additionally, by mitigating heat stress on construction sites, the use of ice slurry can also improve work at height safety by reducing the risk of heat-related accidents and injuries. 

Course Fees (Incl GST)

SCAL members: $75.60

Non-members: $108.00 

Speaker Profiles

Leo Deng Lip, Team Lead, Ops (Con), OSH Inspectorate Department, Ops (Construction) & Surveillance, Ministry of Manpower

Deng Lip is currently with the Construction Operation of the OSH Inspectorate Department, MOM. He has over 19 years of experience with the Ministry, focuses mainly on the construction sector, with works including inspection of construction worksites, investigations into accidents and dangerous occurrences, assessment of management systems and auditing. 

Alvin Tan, Senior Manager (WSH Technology), WSH Institute (WSHI)

Alvin is Senior Manager (WSH Technology) at the WSH Institute (WSHI), a department in the Occupational Safety and Health Division (OSHD), Ministry of Manpower (MOM). He has over 10 years of experience, spanning commercial ship repair and retrofitting, and implementation of work pass policies.

In WSHI, he is driving identification and adoption of WSH technology solutions in Construction and Facilities Management. In the past years, he has worked with government agencies, industry associations, Institutes of Higher Learning and technology vendors to identify, develop and testbed WSH technologies at different levels of technology readiness. He has also been working closely with partner agencies to include WSH technologies in the Industry Digital Plans as well as raise awareness of practical WSH tech solutions for the industry. 

Rafiqul Islam, Corporate EHS Manager, Chian Teck Realty Pte Ltd

Mr Rafiqul Islam, the Corporate EHS Manager at Chian Teck Realty Pte Ltd, is responsible for developing and implementing policies, programs, and management systems to achieve their corporate goals. He is a self-motivated individual and a person who leads by example. In his more than 20 years of EHS journey in the local construction industry, he takes every opportunity to advocate and champion Workplace Safety by engaging his colleagues/team members to participate in relevant awards held by various Authorities. He strongly believes that workplace accidents can be avoided through education, motivation, and teamwork. 

Crawford Ang, Director, WSHE, Woh Hup (Private) Limited

Crawford has over 25 years’ experience in as a WSH personnel in the construction industry. Was involved in construction of numerous type of development ranging from residential, commercial, civil and infrastructure to industrial buildings like manufacturing, pharmaceutical and chemical plants. Over the years, Crawford has developed a passion to train and impart WSH skills to fellow WSH personnel to enhance this professional as well as hoping that this profession will have more value add to the industry. 

Prof Jason Lee, Associate Professor, National University of Singapore

Jason Lee is currently an Associate Professor in Yong Loo Lin School of Medicine at the National University of Singapore, co-leading the Human Potential Translational Research Programme and directing the Heat Resilience and Performance Centre. He is a member of the WHO and WMO Report on Climate Change on Workers’ Health and Productivity. Jason chairs the Scientific Committee on Thermal Factors at the International Commission on Occupational Health and is on the management committee at the Global Heat Health Information Network.

Course Duration

0.5 Day Course

  • Training Hours – 4.0 hours

  • Assessment Hours – 0 hours

Medium Of Instruction

  • English

Funding Information

This webinar is not eligible for funding.

 

Accreditations

SDU: 4 Points

 

Course Brochure

Construction Safety Webinar: “Work-at-height” (Technology and Innovation)

Register



Friday, March 17, 2023

WSH Case Studies For Learning

 What is WSH Case Studies

WSH Case Studies is a free resources for various groups from management and safety professionals to supervisors and workers for improving WSH practices .

It offers insights to past  accidents that have taken place in Singapore. The case studies not only provide lessons learnt for the industry, but more importantly, they remind us to actively review our current practices and continually find ways to make our workplaces safer. Readers are encouraged to carefully think through each case, review its relevancy and context to specific workplace situations, and incorporate the lessons learnt where appropriate.

Here are some workplace accidents case studies for your review 

1)WSH Case Studies - Chemical Industry

This booklet is divided into various sections according to type of incident for easy reference. The 5M (Mission, Man, Machine and Management, Medium) Model (see Appendix B) is used to analyse the contributing factors of each case. At the end of the booklet is a section on occupational health hazards. Unlike safety hazards, consequences posed by occupational health hazards may not be as obvious and immediate. Adverse health effects may be chronic in nature and can take a long time for the occupational disease to manifest. This section will show innovative approaches used in addressing exposure to occupational health hazards involving noise, ergonomics and chemicals. 

2)WSH Case Studies -Accident Involving Working At Heights

Case Studies of Accidents Involving Working at Heights is the result of collective efforts of Ministry of Manpower and National WAH Safety Taskforce. Past concluded fatal accidents were compiled and categorised according to incident types for ease of reference. Through root cause analysis of these accidents, causes were examined and key learning points shared. The lessons and recommendations within will help you in implementing appropriate WSH measures at your workplaces to prevent work at heights injuries 

3)WSH Case Studies -Working in and around Water

This case studies booklet aims to raise WSH awareness and reiterate the importance of strengthening WSH ownership at all levels. It was developed by the Ministry of Manpower and the WSH Council, with feedback solicited from members of the WSH Council (Marine Industries) Committee, National Maritime Safety at Sea Council, and the MPA-Harbour Craft Safety Working Group. The ten case studies include scenarios like transfer to and from vessels, transport via barges, mooring and diving operations. Each incident will be accompanied by lessons learnt and recommendations.

4)WSH Case Studies -Wood Working

This case studies showcased 3 workplace accident associated with fingers severed by both table saw and circular saw in the Wood Working Industry

5)WSH Case Studies -Fatal Fire in LPG Filling Facility

Workplaces handling LPG and other flammable substances, are reminded to take heed of the learning points and implement effective risk control measures to prevent any similar recurrences.

In summary, the four learning points from the incident are:

1) Protect small-bore pipelines from accidental impact;
2) Provide a master shutdown button for safe and coordinated stoppage of gas filling;
3) Provide fire retardant clothing (FRC) to workers working with flammable substances; and
4) Plan and implement an effective emergency response

6)WSH Case Studies - Fatal Accident Involving Failure of a Tower Crane

This case studies showcased Learning Report involving Failure of Luffing Jib Tower Crane at Kajima Overseas Asia (Singapore) Pte Ltd’s Worksite Located at Tan Tock Seng Link.In summary, the two key learning points from this incident are:

1) Eliminate Risk of Entanglement between Erection Ropes and other Structures; and

2) Ensure Erection Ropes return to their Resting Position.

7)WSH Case Studies - Construction Industry

This compilation of case studies on fatalities in the construction industry depicts how the accidents occurred and provides valuable learning points on how they could have been prevented.

1. Falls from Height

2. Worker Struck by Fall

3. Electrocution

4. Worker Struck by/against Objects/Machines

8)WSH Case Studies - Marine Industry

Every year, more than 300 injuries befall our workers in the marine industry. Some workers who are severely injured face long roads to recovery or suffer from permanent incapacity. Some may never return home to their loved ones. It is our belief that no one should be injured at work. Everyone should go home safely every day, free from harm.

The Committee, comprising of business leaders from the marine sector, has put in a lot of effort to safeguard the workers. Although we have reduced the number of fatalities over the years, such incidents still happen, and sadly, some of these incidents are very similar in nature. Hence, the lessons drawn from these incidents are key to us in preventing the next incident from recurring. That is why we have pooled together our WSH expertise from various companies to compile these case studies.

This booklet is divided into various sections according to incident type for easy reference. The underlying causes of these accidents are carefully examined through root cause analysis. Make full use of this compilation, to share these cases at your company’s training or toolbox meetings on a regular basis and undertake study through each case, review its relevancy and context to specific workplace situations, and incorporate the lessons learnt where appropriate. 

9)WSH Case Studies - Logistics & Transport Industry

FALLS FROM HEIGHT

Case 1 Fall from the top of a stack of steel pipes 

Case 2 Fall from height 

Case 3 Fall from skyloader 

CAUGHT IN BETWEEN OBJECTS

Case 4 Caught between the mast section and cabin of forklift 

Case 5 Crushed in between metal racks 

Case 6 Crushed between prime mover and container 

Case 7 Hand crushed by winding rope 

Case 8 Finger severed by swiftly curling tow line 

STRUCK BY MACHINES

Case 9 Finger severed by closing panel cover 

Case 10 Fingers amputated by bandsaw 

STRUCK BY FALLING OBJECTS

Case 11 Struck by falling metal beams 

STRUCK BY MOVING VEHICLES

Case 12 Pinned to ground by toppling forklift 

Case 13 Struck by side loader 

Case 14 Thrown out of vehicle upon collision 

Case 15 Hit by side loader 

ELECTROCUTION

Case 16 Electrocution 

WORK-RELATED TRAFFIC ACCIDENTS

Case 17 Collision between motor bus and motorcycle 

Case 18 Collision between prime mover and motorcycle

10)WSH Case Studies - Metal Working Industry

Machine Operation

Case 1 Aluminium strip pierces a worker’s neck 

Case 2 Worker’s palm gets crushed 

Case 3 Worker’s thumb gets severed 

Machine Maintenance and Troubleshooting

Case 4 Worker pinned by a steel object 

Case 5 Worker gets killed by a steel mesh machine 

Case 6 Worker falls through an opening 

Case 7 Worker’s two fingers get severed 

Case 8 Worker’s two fingers get crushed 

Material Handling

Case 9 Worker killed by a toppling object 

Case 10 Worker’s ring finger gets severed 

Forklift Operation

Case 11 Worker gets pinned under an overturned forklift 

Case 12 Supervisor killed by falling angle bars 

Case 13 Supervisor killed by a collapsing shelter 

Lifting Operation

Case 14 Lorry crane driver gets pinned under H-piles 

Case 15 Worker is pinned between a gantry crane and a building column

Case 16 Worker gets killed by toppled scaffold frames 

Case 17 Worker falls and gets crushed by an electrical distribution box

Case 18 Worker’s fourth finger gets partially amputated 

Case 19 Worker’s middle finger gets partially amputated 

Case 20 Worker loses his left little finger 

Material Storage

Case 21 Store assistant falls off a cantilever rack 

Case 22 Worker is crushed by toppling steel beams 

Case 23 Worker falls from a stack of platform beam trusses 

Other Cases

Case 24 Worker falls from a stepladder 

Case 25 Worker killed by a ruptured pressure receiver 

Case 26 Worker gets electrocuted while removing an extension cord

Case 27 Worker crushed by a toppling stiffener plate 

Case 28 Worker is pinned under a toppled I-beam 

11)WSH Case Studies - Food Manufacturing Industry

Case 1 Worker Found Dead Inside Mixing Tank 

Case 2 Worker Killed during Machine Cleaning 

Case 3 Worker Loses Finger when Working with Band Saw 

Case 4 Worker Struck by Fallen Window Sash 

Case 5 Worker Died after Slip and Fall at Bread Factory 

Case 6 Worker’s Hand Caught in Meat Mincer

 


WSH Case Studies -Food Manufacturing Industry

What is WSH Case Studies

WSH Case Studies is a free resources for various groups from management and safety professionals to supervisors and workers for improving WSH practices .

It offers insights to past  accidents that have taken place in Singapore. The case studies not only provide lessons learnt for the industry, but more importantly, they remind us to actively review our current practices and continually find ways to make our workplaces safer. Readers are encouraged to carefully think through each case, review its relevancy and context to specific workplace situations, and incorporate the lessons learnt where appropriate.

WSH Case Studies - Food Manufacturing Industry

Case 1 Worker Found Dead Inside Mixing Tank 

Case 2 Worker Killed during Machine Cleaning 

Case 3 Worker Loses Finger when Working with Band Saw 

Case 4 Worker Struck by Fallen Window Sash 

Case 5 Worker Died after Slip and Fall at Bread Factory 

Case 6 Worker’s Hand Caught in Meat Mincer

To learn more click