Legal And Other legal Requirements For The Control Of Hazards For Erecting Of Metal Scaffolding
3. | Metal scaffolding –Erecting of metal scaffolding for access to work | 1)WSH Act Para 15- Duties of person shall wear PPE 2)WSH(Construction) Reg 2007 Para 33(2)-Duties of employers to provide PPE 3)WSH(Scaffold)Regulations 4)WSH ( First Aid) Regulations 5)WSH (Incident Reporting) Regulations 6)Environmental Protection& Management Act ) Chapter94A 7)WSH (General Provision) Regulations 8)WSH (Risk Management) 9)CP 14:1996 Code of Practice for Scaffolds 10)CP 20:1999Code of Practice for Suspended Scaffolds 11)Factories (Scaffolds) Regulations 2004 12)Factories ( Safety Training Courses) Order 2001 & WSH ( Construction) Regulations 2007,regulation 9 | 1)Workers shall don the safety harness when working on scaffolds at all times 2)Workers shall anchor their safety harness at all times whilst working on scaffolds 3)Employers shall provide safety harness, provide safe means of access, ensure all identified openings are covered with steel plate toe board and scaffolds erected with metal barricade and metal guardrails 4)Employers/scaffold supervisor shall report all industrial accidents to MOM within 10 days through I-reporting 5)First aid kit shall be provided at site for emergency use 6)Employers shall ensure his workers employed to carrying out work in erecting of scaffolding/installing of suspended scaffold shall attend the scaffold erector course/suspended scaffold rigger course | 1)PTW (accompanied with risk assessment,& methods of statements) shall be apply for painting at height and shall be approved by the HSE department before work commencement 2)Scaffold supervisors directing all scaffolding activities must be MOM approved scaffolding supervisors and be trained & qualified 3)First Aid kit shall be make available at site for emergency use. 4)Workers & scaffold supervisor working on a scaffold structures shall ensure the following: a)They shall anchored their safety harness at all times b)They shall ensure all visible openings on the scaffolds are effectively covered using reasonable practicable means c)They shall ensure all scaffolds are erected with reasonable practicable means of metal barricade and metal guards rails and steel plate metal toe boards d)They shall ensure sufficient and secured anchorage, by means of a life line or otherwise for the safety harness or safety belt e)They shall ensure the anchorage shall not be lower than the level of the working position of the person wearing the safety harness or safety belt 5)Daily safety toolbox meeting shall be conducted prior to work 6)All safety harness shall be physically check for damages by the workers and verified by the scaffold supervisor daily prior to use 7)No materials shall be kept at or near the edge of the building scaffolds 8)Scaffold Supervisors shall perform integrity scaffold checks daily & ensure it’s integrity daily prior to work commencement 9)All works on scaffolds in open areas shall ceased when there is signs of lightning & thundering 10)All industrial accidents shall be reported to MOM within 10 days through I-reporting 11)Employers engaged as contractor to provide scaffolds services shall ensure the provision of reasonable practicable means of PPE, safe means of access and egress to ensure his workers at work 12)Building tops shall be housekeep and nothing shall positioned in such a manner that would poses a tripping hazard 13)Worker carrying out work in erecting of scaffolding/installing of suspended scaffold shall attend the scaffold erector course/suspended scaffold rigger course 14)Project manager in charge of construction activities in building and engineering construction worksites of a contract sum of $10 million or more shall attend the construction safety course for project managers |
No comments:
Post a Comment