Legal And Other Requirements For The Control Of Hazards For Air conditioning, refrigeration & Ventilation Works
| 5. | Air conditioning, refrigeration and   ventilation works-installation of air –con and ducting | 1)WSH   Act Para 15- Duties of person shall wear PPE 2)WSH(Construction) Reg 2007 Para 33(2)-Duties of employers to provide PPE 3)WSH(Scaffold)Regulations 4)WSH(Risk management )Reg 5)WSH(Scaffold)Regulations) CP 14:1996 6)Code of Practice for Scaffolds 7)CP 20:1999 Code of Practice for Suspended Scaffolds 8)Factories (Scaffolds) Regulations 2004 9)Factories ( Safety Training Courses) Order 2001 & WSH ( Construction) Regulations 2007,regulation 9 10)WSH(General rovision)Regulations11)Environmental Protection & Management (Ozone Depleting Substances Regulations Reg 9 12)Environment Protection & Management Act(Chapter 94A Section 77)Environmental Protection & Management)Energy Conservation Reg | 1)Workers   shall don the safety harness when working on scaffolds 2)Workers shall anchor the safety harness 3)Employers/scaffold supervisor shall provide safety harness, provide safe means of access, ensure all identified openings are covered with steel plate toe board and scaffolds erected with metal barricade and metal guardrails 4)Employers/scaffold supervisor shall report all industrial accidents to MOM within 10 days through I-reporting 5)Contractors shall engage licensed waste contractor for disposal of the empty paint containers 6)First aid kit shall be provided at site for emergency use | 1)PTW (accompanied with risk assessment,&   methods of statements) shall be apply for air conditioning  refrigeration & ventilation at height   and shall be approved by the building HSE department before work commencement 2)Scaffold supervisors directing all scaffolding   activities must be MOM approved scaffolding supervisors and be trained &   qualified 3)First Aid kit shall be make available at site   for emergency use. 4)Workers & scaffold supervisor working on a scaffold structures shall ensure the following: a)They shall anchored their safety harness at all times b)They shall ensure all visible openings on the scaffolds are effectively covered using reasonable practicable means c)They shall ensure all scaffolds are erected with reasonable practicable means of metal barricade and metal guards rails and steel plate metal toe boards d)They shall ensure sufficient and secured anchorage, by means of a life line or otherwise for the safety harness or safety belt e)They shall ensure the anchorage shall not be   lower than the level of the working position of the person wearing the safety   harness or safety belt 5)Daily safety toolbox meeting shall be conducted   prior to work 6)All safety harness shall be physically check for damages by the workers and verified by the scaffold supervisor daily prior to use 7)No materials shall be kept at or near the edge   of the building scaffolds 8)Scaffold Supervisors shall perform integrity   scaffold checks daily & ensure it’s integrity daily prior to work   commencement 9)All industrial accidents shall be reported to   MOM within 10 days through I-reporting 10)Employers engaged as contractor to provide   scaffolds services shall ensure the provision of reasonable practicable means   of PPE, safe means of access and egress to ensure his workers safety whilst   carrying out thet work 11)Contractor shall ensure that only approved Air   refrigerant and energy saving label air conditioner is use 12)Worker carrying out work in erecting of   scaffolding/installing of suspended scaffold shall attend the scaffold   erector course/suspended scaffold rigger course 13)Project manager in charge of construction   activities in building and engineering construction worksites of a contract   sum of $10 million or more shall attend the construction safety course for   project managers | 
 
 
No comments:
Post a Comment